Originally shared by Rick Sollie Got the frame finished but I think I made

Originally shared by Rick Sollie

Got the frame finished but I think I made a mistake somewhere. I placed the rods on the alignment stands and I get a gap between the bearing holder and the top piece of extrusion. What is the distance between the top of the machine and the hole that supports the upper level cross extrusion?

CC on the cross rods is 14mm on both HercuLien and Eustathios.

CC (or top/top) of the top horizontal extrusion to the lower horizontal extrusion is 85mm (as best I can tell, I am using edrawings viewer from my phone)